uwMike.com

I will be in Seattle in September, and back in Waterloo next January.

Bed Building

May 8th, 2008

Home Depot Receipt

The cost would’ve been almost cut in half if I were building a twin instead. All the narrow-side pieces had to be cut from 8′ lengths—a lot of wood was left over.

© 2004-2008, Mike Purvis, some rights reserved. I'm running Wordpress, and I have an RSS feed.